Thursday, 18 October 2012

Production Schedule

Here is the production schedule that my group and I made. This makes it clear to us exactly what needs to be done and when. It also allows us to tell the actors when and where they will be needed. It makes sure that we don't forget to film any aspects of the video so is pretty important. We will give our cast a copy of the times that we need them and if we need them to bring anything. But the only thing that we have asked them to bring is warm clothes (for the location shoot as this will be shot in the evening) so we have asked them to bring hoodies. We will provide towels at the location - as we need to make sure that none of the girls are too cold at any point whether they are being shot at the time or not.


Here is the timetable that we will give to the actors telling them what times we will need them from and til.  

Georgie 9:00 - 11:00; 13:30 -TILL THE END
Sasha 9:00 - 13:30; 15:30 -TILL THE END
Annabel 9:00 - 13:00; 15:30 - TILL THE END
In between the 3.30 and 'till the end' we will be moving to the location so we might want to grab a bit to eat before we go to location because we need to make sure that our cast is properly looked after and feel confident and happy at all times so this allows us to get the best shots possible.



We each have jobs that we have to do before shoot day - most of these are sourcing costumes. We have bought the singers dress so now the most important on the list is getting the dresses for the two underwater girls.

Sasha – chiffon ( material )
Hannah – 2 underwater dresses
Evie- towels (6), blankets (4), warm coat